Core tip: What is the production process of the swimwear factory? For those who have worked in a swimwear factory, they generally know about it. But some customers do not understand the production process of the swimwear factory, so they give

What is the production process of a swimwear factory? For those who have worked in a swimwear factory, they generally understand it.

However, some customers do not understand the production process of the swimsuit factory, so the delivery period given is particularly short, so the swimsuit factory has no way to operate.

1. Let’s start with the quotation: After the swimsuit factory receives the sample or drawings from the customer, if it is only a rough quotation, it only takes 1 day. Because the approximate quotation does not require detailed accounting for each material, only the approximate amount can be quoted. This kind of quotation is generally for customers who have preliminary cooperation intentions and want to know the approximate price of the factory or those who only require the factory to quote the approximate price if the information is not complete. A detailed quotation usually takes 3 days. First, the technical department produces a paper sample and calculates all the material prices, then the purchasing department calculates the detailed cost, and finally the sales department reports the unit price. The detailed quotation is compared with the intention of cooperation of the guests high.

2. Proofing: After the quotation is out, if the customer feels that the unit price is appropriate, the factory will be asked to start proofing. The sampling time is generally 7-14 days depending on the busyness of the factory.

3. After the customer confirms the model, if there is any modification, the general modification time is 5-7 days. If there is no need to modify, the business department will start placing an order with the customer after the template is OK. The process is generally not easy to grasp, depending on the progress of the customer.

4. After the customer places an order, the business will sort out all the information and send it to the documentary (if translation is needed, the business also needs to complete the document translation). There are two types of documentary: one is business documentary, which is facing business or The customer, one is the production documentary, which is facing the factory. The production documentary is responsible for following up the production process of the factory, and feeding back the production problems to the business, so that the business and the customer can communicate and solve it, and the business also updates the customer The data will be notified at any time of production documentary or business documentary.

5. Production documentary or business documentary documents are distributed to various departments. The purchasing department will inform the finance department to purchase materials. The purchase of swimsuit materials generally takes about 15-20 days.

6. If the material is processed twice, the processing time for the second time is generally 7-10 days.

7. After all the materials are complete, the technical department begins to arrange the large pallets, and the production department can start the large pallets after the customers approve the plates.

In short, an order usually takes 40-60 days from the customer’s order to the shipment, and it also takes 35 days (depending on the size of the order). The above is an approximate process from the order to the shipment of the swimwear factory. The specific breakdown is not listed here.


Post time: Nov-06-2020